翻訳と辞書 |
Sri Lanka Railways S12 : ウィキペディア英語版 | Sri Lanka Railways S12
Sri Lanka Railways Class S12 is a diesel multiple-unit (DMU), built for Sri Lanka Railways by China's CSR Corporation. First batch arrived in Sri Lanka in August 2012. They were built to replace locomotive-hauled passenger trains. Seven of the S12 DMUs were ordered to strengthen long-distance travel on the Main line from Colombo to Badulla. Four of S12s will serve the Kelani Valley Line. The remaining two designed as luxury trains. == History == The S12 DMUs were meant to improve services on the Main Line and the Kelani Valley Line. The steep slopes on the up-country portion of the Main Line is difficult to operate. Prior to the S12, only a few models of locomotives were capable of operating this line. As DMUs started to replace locomotive-operated trains on other lines, the up-country Main Line could not be operated by DMUs. The S12 is the first DMU to handle these conditions. The locomotives are purchased under a USD 101 million credit line agreement with China. The loan would be settled within 15 years. In September 2012, the first units had trial runs.〔 The first Main-Line train using the S12 began in 23 October 2012.
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Sri Lanka Railways S12」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|